Auftraggeber | Sociedad Generadora |
---|---|
Standort | Osorno, Región de los Lagos, Chile |
Laufzeit | 2020 |
Leistung | 20MW |
Performance tests based for the Chuyaca power plant, a backup generation plant consisting of 8 generators (8 Power Team diesel motors of 2,5 MW each).
Realization of performance test required by the Chilean independent grid operator, Coordinador Eléctrico Nacional. Testing methodology according to ISO 3046 and ISO 15500.