This project encompasses a ±500 kV direct current power transmission line (> 1,000 km), the construction of two substations, two ground electrode stations and connection of the 400 kV AC substations to the national power grids.
Trianel offshore wind farm (Borkum West) is a 200 MW offshore wind farm in the German North Sea.
Engineering Services: