The project covered the initial preparatory phase of the dismantling of the first nuclear power plants of ENGIE Electrabel. In 2012, the preparations began for the implementation of the decommissioning of the eldest units.
Sylwin Alpha was at the time of installation the largest and heaviest HVDC substation in the world. Innovative and patented engineering ensured a smooth installation.
Design of: