Tractebel developed conceptual project for the expansion of the Bauxite thickened waste pumping system (22% solids).
Teilen Sie dies auf
Auftraggeber
MRN
Standort
Porto Trombetas, Oriximiná - PA, Brasil
Laufzeit
2013
Field survey of installations, definition of the pumping system and analysis of the fluid to be pumped
Calculation and pre-selection of pumps, electric room and automation system design, technical specifications of topography, drilling, concrete, and metallic structures to be used in the implementation of the project