This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Pre-feasibility guidance for SMRs as an option to decarbonize two chemical production assets (US & EU)