Sinjido Wind Farm Project

Jeollanam-do, South Korea
Verbundene Lösungen
Energie

Island Power Investment Co., Ltd. is developing the Sinjido wind farm in South Korea. The Project has a total installed capacity of 17.4 MW comprising five (5) Siemens-Gamesa G132-3.465, 3.465MW wind turbines at 114 meters hub height.

Tractebel Engineering GmbH was assigned by the Island Power Investment Co., Ltd.  as Owner’s Engineer to perform an assessment of the technical and financial aspects of the Sinjido wind farm project from the development stage to the completion of the construction period.

The scope of works of Tractebel as Owner’s Engineer included: i) Wind Resource Assessment; ii) Contracting support for TSA and LTSA; iii) Construction Monitoring and site visits; and iv) tailor-made construction progress reports.

Auftraggeber Island Power Investment Co. Ltd
Standort 4-3 Wolyang-ri, Sinji-myeon, Wando-gun, Jeollanam-do, South Korea
Laufzeit 2016 - 2019
Leistung 17.4 MW