Liouesso hydropower project

Republic of Congo
Verbundene Lösungen
Wasser & Wasserkraft

The Liouesso hydropower project was a key project in the development of the Shanga province in the northern part of the country decided by the presidency. It aims at providing sustainable and stable energy supply to the Ouesso disctrict by damming the Liouesso river. The project will be connected to the national grid. Currently it is operated as an isolated plant.

The project includes:

  • A 40m high CFRD Dam,
  • a power plant with three Francis turbines for a total 19MW capacity,
  • a two bay gated spillway
Auftraggeber Direction Générale des Grands Travaux – Présidence de la République du Congo
Standort Ouésso, Congo
Laufzeit 2013 – 2016
Leistung 3 Francis turbines for a total 19MW

Services Provided

Verbundene Unterbereiche

Verbundene Unterbereiche:
Staudämme Große Wasserkraftwerke