This project encompasses a ±500 kV direct current power transmission line (> 1,000 km), the construction of two substations, two ground electrode stations and connection of the 400 kV AC substations to the national power grids.
Project consists in LNG and CNG refueling station for trucks.
Turnkey EPC
The main equipment of the station are: