This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Auftraggeber | Energia Sustentável do Brasil (ESBR) |
---|---|
Standort | Porto Velho - State of Rondônia, Brazil |
Laufzeit | 2010 - 2012 |
Leistung | 500 kV – 2.375 km |