The project is named FangChenGang Nuclear Power Station phase II (2 x HL1000-1) and is located in FangChenGang-China (GEN III Chinese reactor).
The civil work design of project Hualong 1 is reaching its full production phase.
In order to ensure the quality of the design. CNPDS asked Tractebel to mobilize experts in Shenzhen, in order to review the calculation reports and construction drawings of the inner containment.
Auftraggeber | CNPDC (CGN group) |
---|---|
Standort | Shenzhen, Guangdong, China |
Laufzeit | 2016 - 2017 |