This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
At the Volvo car manufacturing site in Belgium, a study was performed to assess the equipment behavior at different blending rates and 100% hydrogen.
Techno-economic feasibility study