This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Flue gas treatment for largest single-site steelworks in Europe.
Base Scope
Owner’s Engineer