This project encompasses a ±500 kV direct current power transmission line (> 1,000 km), the construction of two substations, two ground electrode stations and connection of the 400 kV AC substations to the national power grids.
Feasibility study and implementation study of a new LNG jetty of the LNG terminal in Zeebruges.
Phase I: Feasibility study
Phase II: Implementation study